7-YP IRRIGATION
7-YP IRRIGATION
7-YP IRRIGATION
7-YP IRRIGATION
Project Location
Adana/ Karataş
Purpose
Irrigation and Drainage
Scope of the Project
Construction of Pump Station (One for Drainage, One for Irrigation)
Manufacturing and Installation of Canalet (64.395 m)
Construction of Discharge Canal (11.755 m)
Construction of Filed Works
Characteristics of the Project
Eren Company Share : % 60
Irrigation Area : 11.373 ha
Irrigation Canal Length : 42.864 m (Stone and Concrete Walls)
Irrigation Canal Length : 347.730 m (Prefabricated Canal)
Drainage Canal Length : 245.341 m
Operation and Maintenance Roads Length: 43.000 m
Siphon Length: : 2.015 m
Irrigation Pump Number : 1
Drainage Pump Number : 1
Field Structure (Culverts, Bridges, etc.) Number :1.288
Excavation : 5.275.200 m³
Fill : 900.000 m³
Concrete : 67.990 m³
Contract Price
18.748.111 USD
Completed