7-YP IRRIGATION

7-YP IRRIGATION

7-YP IRRIGATION

Project Location

Adana/ Karataş

Purpose

Irrigation and Drainage

Scope of the Project
  • Construction of Pump Station (One for Drainage, One for Irrigation)
  • Manufacturing and Installation of Canalet (64.395 m)
  • Construction of Discharge Canal (11.755 m)
  • Construction of Filed Works
Characteristics of the Project
  • Eren Company Share : % 60
  • Irrigation Area : 11.373 ha
  • Irrigation Canal Length : 42.864 m (Stone and Concrete Walls)
  • Irrigation Canal Length : 347.730 m (Prefabricated Canal)
  • Drainage Canal Length : 245.341 m
  • Operation and Maintenance Roads Length: 43.000 m
  • Siphon Length: : 2.015 m
  • Irrigation Pump Number : 1
  • Drainage Pump Number : 1
  • Field Structure (Culverts, Bridges, etc.) Number :1.288
  • Excavation : 5.275.200 m³
  • Fill : 900.000 m³
  • Concrete : 67.990 m³
Contract Price

18.748.111 USD

Completed