ÇARŞAMBA PLAIN RIGHT SIDE DRAINAGE FIRST PHASE

ÇARŞAMBA PLAIN RIGHT SIDE DRAINAGE FIRST PHASE

ÇARŞAMBA PLAIN RIGHT SIDE DRAINAGE FIRST PHASE

Project Location Samsun / Çarşamba
Purpose Drainage
Scope of the Project
  • Construction of Drainage Main Canal Amount of 26.000 m
  • Construction of Flood Control Canal Amount of 15.000 m
  • Length of Drainage Canal Amount of 640.500 m
Contract Price 1.282.532 USD
Completed